CEPCO
This project involves constructing two 380kV underground cable circuits, 6.86 km
The Tuwaiq Project connects the RIC 2 BSP substation to a
The project involves the installation of 115kV underground cables to connect
The Princess Noura Project includes the design, supply, installation, testing, and
This project includes the complete design and installation of two 380kV
The KSP Project consists of two phases. Phase 1 includes the
This project, signed in June 2015 with a contract value of