CEPCO

Design UGC

This project involves constructing two 380kV underground cable circuits, 6.86 km

The Tuwaiq Project connects the RIC 2 BSP substation to a

The project involves the installation of 115kV underground cables to connect

The Princess Noura Project includes the design, supply, installation, testing, and

This project includes the complete design and installation of two 380kV

The KSP Project consists of two phases. Phase 1 includes the

This project, signed in June 2015 with a contract value of