This project involves the design, supply, installation, testing, and commissioning of two 380 kV underground cable circuits, each with a route length of 13 km. The system includes the following key components:
These cables connect BSP 9008 (Abu Bakr Road Substation) and BSP 9024 (Princess Noura Substation) in Riyadh, enhancing power distribution and supporting the continued development of the Princess Noura area.