This project involves the complete design, supply, installation, and commissioning of two 380 kV underground cable circuits with a total route length of approximately 8.23 km, connecting the KAR BSP to the MKW BSP.
The project is designed to ensure a continuous rating of not less than 1000 MVA for each circuit, enhancing transmission capacity and reliability between the KAR and MKW BSPs.