CEPCO

Rabigh Project

The Rabigh Housing 110/13.8kV Substation project includes transformers, breakers, SIS system, auxiliary systems, full SAS, telecom, AMI, and all related civil, mechanical, and control systems, along with 110kV bay extensions at Rabigh City-2 Substation.

Rabigh Housing RBGH 110/13.8 kV Substation – Major Equipment and Works

The Rabigh Housing RBGH 110/13.8 kV Substation will consist of the following major equipment and associated works:

  • 2 × 50/67 MVA 110/13.8 kV Power Transformers
  • 10 × 110 kV GIS Breakers
  • 28 × 13.8 kV Breakers
  • 1 Lot Solid Insulated Bus Duct (SIS) System
  • 2 × 13.8/0.4 kV 750 kVA Auxiliary Transformers
  • 2 × 13.8 kV 7 MVAR Shunt Capacitor Banks
  • 2 × Neutral Grounding Resistors (NGR)

The project also includes the installation of a complete Substation Automation System (SAS), Telecommunication System, and Advanced Metering Infrastructure (AMI) System.

Auxiliary Systems and Accessories

  • Control System bay control panels
  • Protection System bay protection panels and busbar protection panels
  • Communication System
  • AC and DC Systems
  • Lighting System
  • Grounding and Shielding Systems
  • HVAC System
  • Plumbing System
  • Fire Detection and Fire Protection System
  • All associated cables and cable supports

Civil, Structural, and Mechanical Works

The project also includes all civil, steel structural, and mechanical works required for the complete substation setup.

Remote End – Rabigh City 2 Substation

The extension works at the Rabigh City 2 Substation include:

  • 2 × 110 kV Bays
  • Modifications to the Control System, Metering System, Protection System, Annunciation System, SCADA System, and Communication System
  • Civil works required for the modification of the infrastructure at Rabigh City 2 Substation

Project Summary

The Rabigh Housing 110/13.8kV Substation project includes transformers, breakers, SIS system, auxiliary systems, full SAS, telecom, AMI, and all related civil, mechanical, and control systems, along with 110kV bay extensions at Rabigh City-2 Substation.