CEPCO

Aladel Project

This project, signed in June 2015 with a contract value of 305.2 million SR, includes the construction of two 380kV UG cable circuits (8 km), three transition gantries, and deep/square tunnels with shafts, micro-tunnels, and a mechanical building.

Contract Details

  • Contract Sign Date: June 2015
  • Contract Amount: 305,223,910.00 SAR

Scope of Work

The project is divided into three main parts, each addressing different aspects of the construction and installation process.

Part 1: 380kV Underground Cables
  • Work Involved: Construction of two 380kV underground cable circuits (CKT 01) with two cables per phase.
  • Route Length: 8 km

Tasks

  • Design, supply, and installation of cables
  • Construction, testing, and pre-commissioning activities
Part 2: Transition Gantries
  • Work Involved: Construction of three transition gantries to integrate the underground cables into the existing network infrastructure.
Part 3: Tunnels and Mechanical Building
  • Work Involved:
    • Construction of deep and square tunnels, including shafts for cable routing
    • Installation of two micro tunnels
    • Construction of a mechanical building to house essential systems and equipment

Project Summary

This project, signed in June 2015 with a contract value of 305.2 million SR, includes the construction of two 380kV UG cable circuits (8 km), three transition gantries, and deep/square tunnels with shafts, micro-tunnels, and a mechanical building.