This project, signed in June 2015 with a contract value of 305.2 million SR, includes the construction of two 380kV UG cable circuits (8 km), three transition gantries, and deep/square tunnels with shafts, micro-tunnels, and a mechanical building.
Contract Details
Contract Sign Date: June 2015
Contract Amount: 305,223,910.00 SAR
Scope of Work
The project is divided into three main parts, each addressing different aspects of the construction and installation process.
Part 1: 380kV Underground Cables
Work Involved: Construction of two 380kV underground cable circuits (CKT 01) with two cables per phase.
Route Length: 8 km
Tasks
Design, supply, and installation of cables
Construction, testing, and pre-commissioning activities
Part 2: Transition Gantries
Work Involved: Construction of three transition gantries to integrate the underground cables into the existing network infrastructure.
Part 3: Tunnels and Mechanical Building
Work Involved:
Construction of deep and square tunnels, including shafts for cable routing
Installation of two micro tunnels
Construction of a mechanical building to house essential systems and equipment
Project Summary
This project, signed in June 2015 with a contract value of 305.2 million SR, includes the construction of two 380kV UG cable circuits (8 km), three transition gantries, and deep/square tunnels with shafts, micro-tunnels, and a mechanical building.