This project involves constructing 380kV underground cables and overhead lines to connect the Shuaiba PV Power Plant to the national grid, aligning with Saudi Arabia’s Vision 2030 renewable energy objectives.

Shuaiba PV Power Plant – 380kV Underground Cables and Overhead Lines

This project focuses on the installation of 380 kV underground cables and overhead transmission lines to ensure the seamless connection of the Shuaiba Photovoltaic (PV) Power Plant to the national grid. By enhancing the transmission infrastructure, it plays a key role in supporting Saudi Arabia’s renewable energy objectives in alignment with Vision 2030.

Scope of Work

  • Design, supply, and installation of 380 kV underground cable circuits
  • Construction of 380 kV overhead transmission lines connecting the PV plant to the grid
  • Integration with the national grid to ensure stable and reliable power transmission
  • Support for renewable energy objectives under Saudi Arabia’s Vision 2030

Project Summary

This project involves constructing 380kV underground cables and overhead lines to connect the Shuaiba PV Power Plant to the national grid, aligning with Saudi Arabia’s Vision 2030 renewable energy objectives.