The Tuwaiq Project connects the RIC 2 BSP substation to a new 115kV substation via 4.2 km of underground circuits, including complete upgrades to the protection, SCADA, and communication systems at both sites.
TUWAIQ Project – Connection of BSP RIC 2 Substation to TUWAIQ Casting and Forging Facility
The TUWAIQ Project involves connecting the existing BSP RIC 2 Substation to the new 115 kV Substation at the TUWAIQ Casting and Forging Facility. Key aspects of the project include:
Substation Connection
Establishment of two underground circuits using fiber optic cable (FOC), spanning approximately 4.2 km
Scope at NG Room (New Substation) for Line Protection
Installation of two new protection panels
Installation of a new SOE (Sequence of Events) panel
Installation of a new SCADA panel
Installation of a new Annunciator panel
Installation of a new TFR (Transformer) panel
Installation of a new MPLS system
Modification and Installation at Existing RIC 2 Substation for Line Protection
Installation of new protection panels
Modifications to the SAS, TFR panels, and MPLS at the existing RIC 2 Substation to ensure compatibility and integration with the new 115 kV Substation and to enhance line protection
Project Summary
The Tuwaiq Project connects the RIC 2 BSP substation to a new 115kV substation via 4.2 km of underground circuits, including complete upgrades to the protection, SCADA, and communication systems at both sites.